Gamesa will set more than 50 new wind turbines up in Mexico

In December 21, 2016
753 Views

The new wind turbine G132-3.465 MW guarantees the maximum production due to the minimum cost of energy used. In fact, it increases the production of any previous model up to 50%. Without a doubt, this is a significant reason for which Mexico has been the first to sign a contract with Gamesa to get this turbine, or rather, 57 of them.

The G132-3,465 MW owns from 84 to 134 meters, that is, it has four different tower heights, something that will provide the versatility enough to be adapted to the conditions of each region and wind of the American country.

Leave A Comment